Phase I of the James E. Clyburn Transportation Research and Conference Center
The Transit Research Center (TRC) construction project includes approximately 8,500 square feet of automotive research and education space, a Chiller Plant, and site preparation work. The TRC building includes three automotive research bays with recessed observed areas beneath two bays. A fourth bay is dedicated to the cleaning and test preparation of vehicles. In addition to the research area, the TRC houses administrative and training space. The chiller plant includes a mechanical yard with an ice storage chiller system to include pumps and piping. There is also a fueling station with underground gasoline/diesel storage tanks constructed as a part of this building.
Construction of the Emily E. Clyburn Archive Center will begin in the Summer of 2012. The Archive Center is a three story structure programmed to house space for storing and viewing archives generated through research and development and to transportation researcher office space. This facility will function as a full service archival building to include accessioning/isolation space and archival staffing. There will be a virtual library for archive viewing in addition to secured “hands-on” viewing space. The facility will be equipped with classroom space to provide training and conferencing/meeting space.
Thu, 1 Sep 2011![]() |
| General Building Elevation |
Thu, 1 Sep 2011![]() |
| Training Room |
Thu, 1 Sep 2011![]() |
| Vehicle Research Bays |
Thu, 1 Sep 2011![]() |
| Chilled Water Distribution Pump Room |
Thu, 1 Sep 2011![]() |
| Ice Storage System and Chiller Plant |
Wed, 31 Aug 2011![]() |
| Eastside elevation after landscaping |
Fri, 29 Jul 2011![]() |
| Eastside elevation prior to landscaping |
Sun, 17 Jul 2011![]() |
| Exterior Metal Siding Installation |
Sun, 17 Jul 2011![]() |
| Fueling Station Canopy and Drive Installation |
Fri, 17 Jun 2011![]() |
| South Elevation Cast Stone Installation |
Fri, 17 Jun 2011![]() |
| Fueling Station Canopy and Drive Installation |
Thu, 12 May 2011![]() |
| Exterior Metal Siding Track and Chiller Plant Cast Stone Installation |
Thu, 12 May 2011![]() |
| Concrete Drive and Fueling Station Subgrade Preparation |
Mon, 18 Apr 2011![]() |
| East Concrete Drive Installation and Site Preparation |
Fri, 11 Mar 2011![]() |
| Structural Steel Installation |
Wed, 02 Mar 2011![]() |
| Chiller Plant Masonry Block Installation |
Wed, 23 Feb 2011![]() |
| Masonry Block and Structural Steel Installation |
Thu, 10 Feb 2011![]() |
| Chiller Plant Ice Storage Tank Installation |
Fri, 21 Jan 2011![]() |
| East Masonry Block Installation and Site Preparation |
Thu, 23 Dec 2010![]() |
| West Concrete Drive and Loading Dock Ramp Installation |
Fri, 10 Dec 2010![]() |
| Foundation Wall and Masonry Block Wall Installation |
Mon, 15 Nov 2010![]() |
| Chiller Plant Footing and Foundation Wall Installation |
Thu, 28 Oct 2010![]() |
| Foundation Wall Installation |
Fri, 08 Oct 2010![]() |
| Installation of Concrete Slab Above Recessed Observation Area |
Wed, 29 Sep 2010![]() |
| Installation of Concrete Slab Above Recessed Observation Area |
Thu, 02 Sep 2010![]() |
| Preparation for the Installation of Concrete Recessed Observation Area Walls |
Fri, 13 Aug 2010![]() |
| Excavation in Preparation for the Recessed Observation Area Walls |
Sun, 01 Aug 2010![]() |
| Installation of Site Erosion Control Measures |